Tuesday 3 December 2013

03.12.2013





B01. Boiler Steel structure
Tier 5 & 6 erection, View from West

B01. Boiler steel structure erection Tier 5 & 6,
and Air Duct erection, view from South

B06. Bunker bay area Steel structure
erection and Silo Duct erection, view from South


B07. Fabric Filter area, Lean concrete
and substructure erection, view from West


Girder at site for lift

B33. Unit Electrical building,
ground flooring plastering & painting,
2nd floor column erection, view from South

B33. Unit Electrical building Transfor area,
View from East 

B33. Unit Electrical building, 2nd floor
column erection, Ground floor plastering
& painting, view from West

B33. Unit electrical building
ground floor painting

B35. Boiler Electrical Building,
first floor slab concrete work, view from East

B63. Turbine Hall civil work,view from North





B63. Turbine Hall concrete work,
view from South



B68. Transformer building fire wall concrete work

C05. Crusher house foundation
steel rebar installation
C40. Light fuel oil Tank retention work

C71. Electrical building near crusher house,
first floor slab concrete work

C72. Electrical building
near Bunker bay - foundation work

Crane assembly 1200 ton

D01. Ash storage pile cap preparation
G02. Raw water storage tank foundation

G05. Demineralized water proudction foundation

G06. Demineralized water effluents foundation

G25. Operational industrial water pump station

L05.  Absorber shell steel rebar installation
and sheet piling


TT16 - Coal Handling system 
Transfer Tower steel structure erection

TT17 - Coal Handling system
Transfer Tower Steel structure erection




No comments:

Post a Comment

Note: only a member of this blog may post a comment.