Monday 16 December 2013

16.12.2013


B01. Boiler all Girder lifted

B01. Boiler Steel structure & Duct erection
View from South


B01. Boiler Steel structure & Duct erection
View from North

B01. All Girder on position

B01. Pressure parts assembly at site

B02. Chimeny erection,
concrete pouring in progress

B06. Bunker area Grating installation

B06. Bunker Bay area steel structure,
grating and Silo duct erection

B01. Silo duct after preassembly 

B07. Fabric filter area,
Pile cap and substructure erection




B33. Unit electrical building
plastering work, view from North 

B33. Unit electrical building 1st floor

B33. Unit electrical building transformer area

B35. Boiler electrical building,
1st floor column erection

B35. Boiler electrical building
Auxiliary transformer area

B63. Turbine hall, basement steel rebar installation



B63. Turbine over view from B33.

B68. Main transformer building

C05. Crushere House foundation work

C40. Light fuel oil storage area retention work


C71. Electrical building near Crusher house

C72. Electrical building near bunker bay

D01. Ash storage pile cap &
lean concrete preparation


E05. Cooling water piping sleeper's foundation

G02. Raw water storage Foundation

G25. Operational water pump station foundation
\

L05. Absorber Tower side wall rebar installation


Coal handling Transfer Tower
Steel structure erection
TT16


TT17




TT18

TT19

TT20

TT21 

TT22

TT23

C71. Electrical building near Crusher house

C72. Electrical building near bunker bay

C73. Electrical building south Coal Yard