Saturday 15 March 2014

15.03.2014

B01. Boiler Pressure parts assembly at site

B01. Boiler pressure parts item for lifting position

B01. Boiler pressure parts item preparation for lift

B01. Boiler pressure parts for lifting position

B01. Pressure parts lifting position



B06. Bunker bay area steel structure & silo duct erection,
view from south

B01. Boiler steel structure, duct and pressure parts erection,
view from South


B01. Boiler Steel structure rear side

B01. Boiler steel structure, preassure parts and duct erection,
B07. Fabric filter steel structure & hopper erection,
view from West

B01. Boiler steel structure, Duct & Preassure parts erection
B07. Fabric filter hopper erection
view from West

B07. Fabric filter hopper erection , view from North

B06. Bunker bay area steel structure and Silo Duct erection,
and Chimeny, view from West


B06. Bunker bay area Mill foundation completion

B07. Fabric filter Hopper casing assembly (B17 area)

B07. Fabric filter steel structure and Hopper erection,
view from South

B07. Fabric filter hopper erection, view from North

B17. Steel structure erection


B33. Boiler electrical building plastering work, view from North

B33. Unit electrical building ground floor- HVAC work

B33. Unit electrical building 1st floor completion of painting

B33. Unit electrical building transformer area


B33. Unit electrical building 3rd floor column erection

B33. Boiler Electrical building, plastering work,
view from East

B35. Boiler electrical building Transformer area,
view from North

B35. Boiler electrical building ground floor,
painting and HVAC work


B35. Boiler electrical building 1st floor
painting and HVAC work

B63. Turbine hall West side



B63. Turbine hall view, North

B63. Turbine hall pedestal concrete work, view from North



B68. Main transformer building concrete repair work

B68. Auxiliary transformer building

B68. Main transformer building ,view from East

C03. Fuel oil pump station foundation work

C05. Crusher house 1st floor column erection

C30. Fuel oil unloading area

C40. Light fuel oil storage retention work



C71. Electrical building near Crusher house

C72. Electrical building near Bunker bay area

D01. Ash storage foundation concrete

E05. Cooling water piping sleeper fooundation piling extension

F06. Cable way foundation

G05, Demineralized water production equipment erection

G05. Equipment erection

G06. Demineralized water effluent foundation

G10. Emergency diesel generator foundation

G16. Industrial waste water treatment

G17. Auxiliary Boiler foundation work


G18. Reserve feed water storage

G25. Operational industrial water pump station foundation work

G25. Operation industrial water pump station foundation
and column erection, view from South



L05. Absorber shell wall concrete work


L13. Aeration basine foundation work

L13. Aeration basin foundation work


L24. FGD Duct foundation work


No comments:

Post a Comment

Note: only a member of this blog may post a comment.