Tuesday 4 March 2014

04.03.2014


B01. Boiler area steel structure erection


B01. Boiler Pressure parts item header preparation for lift

B01. Pressure parts item painting painting


B01. Pressure parts items lifted

B01. Pressure parts item header lifting position

B01. Pressure parts item liting

B06. Bunker bay area

B01 Boiler steel structure & duct erection

B01. Pressure parts item assembly at site

B06. Bunker Bay area steel structure and silo duct erection


B07. Hopper casing assembly
B06. Bunker bay area steel structure and Silo duct erection


B06. Bunker bay area Mill foundation




B06. Bunker Bay area Mill foundation

D01. Ash storage foundation concrete

B07. Fabric filter hopper installation


B33. Unit electrical building ground floor
HVAC duct fram installation


B33. Unit electrical building 1st floor plastering and painting


B33. Unit electrical building transformer area, view from East

B33. Unit electrical building general view from West



B63. Turbine hall steel rebar installation for wall concrete

B63. Turbine hall view North

B63. Turbine hall view from North


B63. Turbine hall west side, view from North

B68. Auxiliary transformer building wide wall rebar installation

B68. Main transformer building concrete repair work

B68. Main transformer building concrete repair


C03. Fuel Oil Pump Station

C30. Fuel Oil Unloading area

C40. Light fuel oil storage foundation retention work and
Condenser Neck equipemtn

C72. Electrical building near bunker bay area

D01. Ash storage foundation concreting

E05. Cooling water piping sleeper foundation pile extension work


G05. Demineralized water production equipment erection

G06. Demineralized water effluents

G10. Emergency diesel generator

G17. Auxiliary boiler foundation work

G18. Reserve feedwateer storage foundation and
E50. Cooling water culvert sheet piling



G25. Operational industrial water pump station

G28. Oil & fire fighting water recovery pit