Tuesday 11 March 2014

11.03.2014


B01. Boiler steel structure erection west side


B01. Boiler pressure parts assembly at site

B01. Boiler pressure parts assembly at site

B06. Bunker bay area steel structure and Silo Duct erection

B01. Boiler steel structure, Duct & Preassure parts erection,
View from South

B01. Boiler preassure parts header on position for lift

B01. Boiler steel structure erection west side,
view from South

B01. Boiler steel structure, Duct & Preassure parts erection
B07. Fabric filter steel structure and hopper erection,
View from West

B01. Boiler steel structure & duct erection
B07. Fabric filter and Hopper erection
view from West

B06. Bunker bay area steel structure and Silo duct erection

B06. Bunker bay area Mill foundation completion

B07. Fabric filter Casing assembly

B07. Farbric filter hopper erection,
View from North

B17/L10 area - Farbic filter casing assembly

B07. Fabric filter steel structure and hopper installation

B33. Unit Electrical building, 3rd floor slab concrete work
and side plastering work

B33. Unit electrical building Ground floor HVAC work

B33. Unit electrical building 1st floor painting completion


B33. Unit electrical building Transformer area,
General view from East

B33. Unit electrical building, view from South

B35. Boiler Electrical building plastering, view from East

B35. Boiler electrical building plastering work, view from North

B35. Boiler electrical building ground floor painting work

B35. Boiler electrical building 1st floor HVAC DUCT and fire
fighting work


B63. Turbine hall West side, side wall rebar installation,
view from South

B63. Turbine hall South End, Side wall rebar installation

B68. Auxiliary transformer building side wall rebar installation


B68. Main transformer building concrete repair work

C03. Fuel Oil pump station

C05. Crusher house 1st floor slab concreete

C30. Fuel Oil unloading area

C40. Light fuel oil retention work


C71. Electrical building near Crusher house


C72. Electrical building near Bunker bay

D01. Ash Storage Foundation concrete

F06. Cable way from Transformer to Switchyard


G05. Demineralized water production equipment erection


G06. Demineralized water effluents

G10. Emergency Diesel Generator

G17. Auxiliary Boiler foundation

G25. Operational industrial water pump station,
foundation concrete, view from North

G25. Operational Industrial water pump station
foundation column erection, view from South

G28. Oil & fire fighting water recovery pit

L13. Aeration basin foundation work

No comments:

Post a Comment

Note: only a member of this blog may post a comment.