Friday 7 March 2014

07.03.2014




Condenser Moduel equipment arrived at site (Condenser Neck)



Condenser Moduel equipment arrived at site (Condenser Neck)

B01. Boiler steel structure, duct & Pressure parts erection,
view from South

B01. Boiler steel structure erection - West side

B01. Boiler pressure parts header lifting position



B01.Boiler pressure parts erection, view from bottom


B01. Boiler pressure parts item header for lift

B01. Pressure parts item erection, view from bottom

B01. Boiler area piping erection


B06. Bunker bay area steel structure and Silo duct erection,
and Cheminey, view from East


B01. Boiler pressure parts assembly at site

B01. Boiler pressure parts assembly at site

 
B06. Bunker bay area steel structure & Silo duct erection,
view from South

B01. Boiler pressure parts lifting position, view from South

B01. Boiler steel structure erection West site

B01. Boiler steels structure, duct and pressure parts erection,
B07. steel structure and hopper erection



B01. Boiler steel structure & Pressure parts erection
B07. steel structure & Hoppere erection, view from West


B06. Bunker bay area Mill fooundation


B06. Bunker bay Mill foundation, view from South



B07. Fabric filter hopper casing assembly (B17 - area)

B07. fabric filter steel structure and hopper erection

B07. Fabric filter hopper erection

B07. Fabric filter hopper casing assembly

B33. Unit electrical building  plastering work

B33. Unit electrical building ground floor HVAC erection

B33. Unit electrical building 1st floor plastering and painting



B33. Unit electrical building Transformer building area

B33. Unit electrical building general view from South



B35. Boiler electrical building, plastering


B35. Ground floor painting and HVAC work


B35. Boiler electrical building  1st floor painting, HVAC &
Fire fighting work

B63. Turbine Hall Side wall concrete & rebar installation


B63. Turbine Hall South end steel rebar installation for wall






B63. Turbine hall concrete wall East side

B63. Turbine hall concrete reinforcement work West side

B68. Auxiliary transformer building

B68. Main transformer building concrete repair work


c
C05. Crusher house 1st floor slab concrete pouring



C72. Electrical building near Bunker bay area

D01. Ash storage foundation concrete

E05. Cooling water piping sleeper foundation piling extension


E50. Cooling water culvert Tubine hall to Aeration basine - sheet piling


F06. Cable way foundation, view from North

G05. D. water production Equipment erection



G10. Emergency diesel generator foundation


G17. Auxiliary boiler foundation

G18. Reserve feed water storage


G25. Operational industrial water pump station






 
L05. Absorber shell - side wall concrete work