B01. Boiler steel structure erection,
view from Southeast


B01. Boiler steel structure erection,
view from East


B01. Boiler steel structure erection,
view from South


B01. Boiler steel structure erection,
view from Southwest


B02. Chimney Slipform ring erection


B10. ID Fan South foundation formwork


B17. Flue Gas Duct foundation backfilling


B33. Unit Electrical Building 1st floor pillar,
 rebar fixing



B35. Boiler Electrical Building foundation pillar,
concrete work


B63. Turbine Hall civil work





B68. Transformer foundation firewall rebar fixing


C05. Coal Crusher House pile cap plug


C07. TT17 Transfer Tower foundation formwork


C71. Coal Crusher House Electrical Substation,
dewatering


E50. Main Cooling Water Culvert civil work



F01. Switchyard Gantry erection


F01. Switchyard foundation concreting


G05. Demin Water Production foundation,
rebar fixing


G06. Demin Water Effluents foundation formwork


G07. Demin Water Storage tank foundation,
rebar fixing


L05. FGD Absorber foundation rebar fixing


L10. Booster Fans foundation backfilling


L13. Aeration Basin pile cap preparation


L24. FGD Duct foundation pile cap preparation