B01. Boiler steel structure erection,
view from Southeast


B01. Boiler steel structure erection,
view from North

B01. Boiler steel structure erection,
view from East


B06. Bunker Bay steel structure erection,
view from South


B01. Boiler steel structure erection,
view from Southwest


B02. Chimney Slipform ring erection


B10. ID Fans foundation concreting 


B17. Flue Gas Duct foundation lean concreting 


B33. Unit Electrical Building 1st floor pillar
rebar fixing 



B35. Bolier Electrical Building foundation
pillar concreting 


B63. Turbine Hall civil works 




B68. Transformer foundation firewall
 rebar fixing 


C04. Coal Yard Reclaimer A foundation wall
 rebar work 


C04. Coal Yard Reclaimer B foundation wall
 concreting 


C05. Coal Crusher House pile plug preparation 


C07. TT17 Transfer Tower foundation
rebar fixing 


C07. TT18 Transfer Tower pile cutting


C71. Coal Crusher House Electrical Subtstation,
dewatering 


E50. Main Cooling Water Culvert excavation 



F01. Switchyard Gantry area 


F01. Switchyard foundation rebar fixing 


G05. Demin Water Production foundation
rebar fixing 


G06. Demin Water Effluents foundation, 
brick laying 


G07. Demin Water Storage Tank foundation concreting 


L05. FGD Absorber foundation rebar fixing 


L10. Booster Fans foundation soil compacting work 


L13. Aeration Basin pile cap preparation 


L24. FGD Duct pile cutting 