Wednesday 18 September 2013

19.09.2013

B01. Boiler steel structure erection,
view from Southeast


B01. Boiler steel structure erection,
view from Southwest 


B06. Bunker Bay steel structure erection,
view from South 


B02. Chimney Slipform ring erection 


B07. Fabric Filter foundation dewatering  


B10. ID Fans foundation area pile cutting 


B17. FGD Duct foundation lean concreting 


B33. Unit Electrical Building 1st floor column
rebar & formwork



B35. Boiler Electrical Building foundation ground floor
column concrete completed 


B63. Turbine Hall civil work 






B68. Transformer foundation firewall rebar fixing 



C05. Coal Crusher House pile plug preparation 


C06. Coal Belt Conveyors piling work 


C07. TT23 Transfer Tower foundation dewatering 


C71. Coal Crusher House Electrical Substation
foundation dewatering 


F01. Switchyard Section 2 foundation rebar fixing 


F01. Switchyard Section 8 foundation gravel filling 


G05. Demin Water Production foundation rebar fixing 


G06. Demin Water Effluents foundation backfilling 


L05. FGD Absorber foundation rebar fixing 


L10. Booster fans foundation area soil compacting 


L24. FGD Duct pile cutting completed 