Tuesday 24 September 2013

24.09.2013

B01. Boiler steel structure erection,
view from East


B01. Boiler duct erection 


B01. Boiler steel structure & duct erection,
view from South 


B01. Boiler steel structure & duct erection,
view from Southwest 


B02. Chimney Slipform ring erection 


B07. Fabric Filter dewatering completed,
view from South 


B07. Fabric Filter view from North 


B10. ID Fans foundation area,
view from South 


B17. Flue Gas Ducts foundation rebar fixing,
view from West 


B17. Flue Gas Ducts foundation rebar fixing,
view from North 


B33. Unit Electrical Building 1st floor column
rebar fixing, view from Northeast 


B33. Unit Electrical Building 1st floor column
formwork, view from Southwest 


B35. Boiler Electrical Building 1st floor foudation
preparation, view from East 


B63. Turbine Hall civil work 





B68. Transformer firewall rebar fixing,
view from Northeast 


B68. Transformer firewall rebar & formwork,
view from Southwest 


C04. Coal Yard area 


C04. Coal Yard Reclaimer Line A rebar & formwork,
view from Southeast 


C04. Coal Yard Reclaimer Line B concreting,
view from Southeast 


C05. Coal Crusher House foundation rebar preparation 


C06. Coal Belt Conveyor pile plug preparation,
view from B01 North 


C07. TT16 Transfer Tower steel structure erection 


C07. TT17 Transfer Tower foundation concreting completed 


C07. TT18 Transfer Tower piling,
view from East 


C07. TT23 Transfer Tower foundation dewatering 


C07. TT19 Transfer Tower foundation excavation,
view from North 


C40. Light Fuel Oil Storage pile cutting, 
view from North 


C71. Coal Handling House Electrical Substation
formwork


C73. Coal Handling Coal Yard Electrical Substation
excavation 


D01. Fly Ash Storage foundation preparation 


E02. MCW Pumphouse excavation 



E02. MCW Pumphouse South tie-in slab rebar fixing



E05. MCW Piping saddle rebar & formwork 


E06. Electrochlorination Building piling completed 


E50. MCW Culvert struts erection 



F01. Switchyard Section 2 equipment steel structural erection 


F01. Switchyard Section 2 foundation rebar & formwork,
view from South 


F01. Switchyard Section 3 Gantry erection preparation 


G05. Demin Water Treatment Plant foundation
rebar fixing 


G06. Demin Water Neutralization foundation
rebar & formwork 


L05. FGD Absorber foundation rebar fixing 


L10. FGD Booster Fans foundation area lean concreting 


L13. FGD Aeration Bassin pile cutting 


L24. FGD Ducts pile plug preparation 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.