Thursday 26 September 2013

27.09.2013

B01. Boiler steel structure erection,
view from East


B01. Boiler steel structure erection,
view from Southeast


B01. Boiler steel structure erection,
view from North


B01. Boiler Duct erection


B01. Boiler steel structure erection,
view from West


B06. Bunker bay steel structure erection,
view from South


B01. Boiler duct erection


B02. Chimney Slipform ring erection


B07. Fabric Filter pile cap preparation


B10. ID Fans foundation area


B17. Flue Gas Ducts foundation rebar fixing,
view from West


B17. Flue Gas Ducts foundation rebar fixing,
view from North


B33. Unit Electrical Building 1st floor column concreting,
view from Southeast


B35. Boiler Electrical Building 1st floor slab formwork,
view from East


B63. Turbine Hall civil work





B68. Transformer firewall rebar & formwork,
view from Southwest


C05. Coal Crusher House pile cap preparation 


C07. TT023 Transfer Tower dewatering


C40. Light Fuel Oil Storage foundation lean concreting


C71. Coal Crusher House Electrical Substation
foundation pedestal concreting


D04. Fly Ash Conveyor pile cap preparation


D20. Fabric Filter Compressed Air Building
excavation, view from East


F01. Switchyard Section 2 equipment steel erection


F01. Switchyard Section 3 Gantry steel structure
preparation


F01. Switchyard Section 1 foundation rebar fixing


F01. Switchyard Section 5 foundation formwork


F01. Switchyard Section 2 foundation concreting


G05. Demin Water Treatment Plant foundation rebar fixing


G06. Demin Water Neutralization foundation rebar & formwork


G07. Demin Water Storage Tank foundation piling


L05. FGD Absorber foundation rebar


L10. FGD Booster Fans foundation area rebar fixing


L13. FGD Aeration Bassin pile cap preparation


L24. FGD Ducts foundation pile cap preparation

No comments:

Post a Comment

Note: only a member of this blog may post a comment.